> Now, the research team is conducting systematic studies on the key scientific issues related to adding thorium, and aims to completethe construction of a 100-megawatt TMSR demonstration project, and begin operation by 2035.

For comparison: A commercial nuclear power plant is 1 gigawatt, a 10x difference. I assume this would be the next step.

allenrb 4 hours ago

The typical 1 gigawatt rating for a nuclear power reactor is measuring electrical output. Given the various inefficiencies, the actual reactor output (as heat) is something like 3x that amount. Whereas a research reactor will be quoted as thermal output.

That to say, a typical commercial reactor might be 30x the power of a 100 MW research device.